Kokkonen, A and Vaagaasar, A L (2018) Managing collaborative space in multi-partner projects. Construction Management and Economics, 36(02), 83-95.

Loosemore, M and Lim, B T H (2018) Mapping corporate social responsibility strategies in the construction and engineering industry. Construction Management and Economics, 36(02), 67-82.

Odoemena, A T and Horita, M (2018) A strategic analysis of contract termination in public-private partnerships: Implications from cases in Sub-Saharan Africa. Construction Management and Economics, 36(02), 96-108.

Olivieri, H, Seppänen, O and Denis Granja, A (2018) Improving workflow and resource usage in construction schedules through location-based management system. Construction Management and Economics, 36(02), 109-24.

  • Type: Journal Article
  • Keywords: construction management; location-based management system; critical path method; workflow; resource scheduling; schedules; task scheduling; critical path; planning; resource management; workflow software; construction industry
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2017.1410561
  • Abstract:
    Critical Path Method (CPM), a planning and controlling technique, is widely used in the construction industry. However, CPM is criticized for its lack of workflow and inability to schedule continuous resource usage. Location-Based Management System (LBMS) fill these gaps and has been implemented in many construction projects. We propose that LBMS will improve schedules and project performance, addressing CPM's main shortcomings. This study is composed of three case studies. CPM schedules were analyzed and were improved using LBMS tools. The resulting schedules show improved workflows, crew balancing, resource usage and had fewer interruptions, without affecting project duration. Furthermore, LBMS schedules were optimized with only a few scheduling operations and fewer planning elements. The computational benefit of LBMS increases with the number of locations and tasks in a schedule. Project managers will benefit from a simpler scheduling process and better resource flow.;Critical Path Method (CPM), a planning and controlling technique, is widely used in the construction industry. However, CPM is criticized for its lack of workflow and inability to schedule continuous resource usage. Location-Based Management System (LBMS) fill these gaps and has been implemented in many construction projects. We propose that LBMS will improve schedules and project performance, addressing CPM's main shortcomings. This study is composed of three case studies. CPM schedules were analyzed and were improved using LBMS tools. The resulting schedules show improved workflows, crew balancing, resource usage and had fewer interruptions, without affecting project duration. Furthermore, LBMS schedules were optimized with only a few scheduling operations and fewer planning elements. The computational benefit of LBMS increases with the number of locations and tasks in a schedule. Project managers will benefit from a simpler scheduling process and better resource flow.;